[Dec 17, 2021] DES-6322 Ultimate Study Guide - TestkingPDF
Ultimate Guide to Prepare DES-6322 Certification Exam for DCS-IE in 2021
Dell EMC VxRail Specialist Exam Certification Details:
| Exam Name | Dell EMC Certified Specialist - Implementation Engineer - VxRail (DCS-IE) |
| Exam Code | DES-6322 |
| Schedule Exam | Pearson VUE |
| Passing Score | 63% |
| Exam Price | $200 (USD) |
| Duration | 90 mins |
| Books / Training | VxRail Appliance 7.0.XXX Concepts - ES101CPX02007 - On Demand VxRail 7.0.XXX Feature - REST API - ES102CPX02009 - On Demand VxRail Installation and Implementation - ES524CPX00074 - Classroom/Virtual Classroom VxRail 7.0.XXX Installation and Implementation - ES502CPX02031 - On Demand |
| Number of Questions | 60 |
| Sample Questions | Dell EMC VxRail Specialist Sample Questions |
NEW QUESTION 44
What is a characteristic of the VxRail S Series node?
- A. Large form factor drives
- B. Form factor of 1U1N
- C. Dense Flash disks
- D. Form factor of 2U4N
Answer: B
NEW QUESTION 45
What is the correct CL! command to collect only the VxRail Manager logs?
- A. vc-support sh -v
- B. generateLogBundle py -v
- C. generateFullBundle.py -c
- D. vm-supportsh -c
Answer: C
NEW QUESTION 46
A VxRail Cluster has just been deployed. Use the VxRail simulator to determine the Service Tag, Model, and ESXJ IP Address of the first node - vcluster730.esx01.edu.local.
Note: It is necessary to dose (x) the simulator window before you can select a response to this question.






- A. Option D
- B. Option B
- C. Option A
- D. Option C
Answer: A
NEW QUESTION 47
An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION 48
An implementation engineer is configuring External SRS. Where can they find the installation files for SRS VE?
- A. VxRail Support Matrix
- B. VxRail Manager
- C. Dell Support Page
- D. SolVe Online
Answer: B
NEW QUESTION 49
An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?
- A. Extensive maintenance
- B. Temporary maintenance
- C. Permanent removal of host from cluster
- D. Shutdown of an entire cluster
Answer: A
NEW QUESTION 50
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?
- A. Service laptop must be on the same IP network as the iDRACs
- B. At least 36 in (92 cm) clearance exists in front of and behind the cabinet
- C. Power distribution must support the power rating of a single node
- D. Single power zone must be used with adequate power cables
Answer: C
NEW QUESTION 51
A VxRail API request has been executed and the user account does not have vCenter privileges to perform the task.
What code is returned?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION 52
Match each component of the VxRail HCI System Software to its description.
Answer:
Explanation:
NEW QUESTION 53
What is a consideration when adding nodes to a VxRail G Series chassis?
- A. G560 and G410 nodes are permitted in the same chassis
- B. In a full G Series chassis, all nodes must have 10GbE ports
- C. All nodes in a G Series chassis must be identical
- D. Hybrid and All-Flash nodes are permitted, if in different chassis
Answer: C
NEW QUESTION 54
During the activation of Internal SRS, the implementation engineer receives a message that the deployment has failed What is a possible cause?
- A. SRS VE Gateway on the same subnet as the VxRail Manager
- B. Witness Gateway not configured following Dell best practices
- C. VxRail status already set to installed' in IB database
- D. Site ID mismatch between the IB database and the SRS Wizard
Answer: A
NEW QUESTION 55
From what location should NVT for VxRail be run?
- A. VxRail network Top of Rack switch
- B. Jump server on a different network
- C. Laptop connected to the first VxRail ESXi node
- D. Workstation on the same network as VxRail Manager
Answer: C
NEW QUESTION 56
A VxRail Test Plan has been completed What is the protocol for recording the results'?
- A. In front of a customer, complete each test and document the test date
- B. With the implementation team, complete and document each test, test date, and a screenshot of results
- C. With the implementation team, complete each test and document the test date
- D. In front of a customer, complete and document each test, test date, and a screenshot of results
Answer: D
NEW QUESTION 57
Use the VxRail simulator to explore the system. What is the presented configuration?
Note: It fs necessary to close (x) the simulator window before you can select a response to this question.




- A. Internal vCenter and external DNS
- B. External vCenter and external DNS
- C. Internal vCenter and Internal DNS
- D. External vCenter and internal DNS
Answer: A
NEW QUESTION 58
Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?
- A. Node hardware must be identical to the other three nodes
- B. New node must be at the same VxRail version as existing nodes
- C. PCIe network card must be added to all nodes
- D. Node requires only the same drive configuration
Answer: D
NEW QUESTION 59
What is a consideration when expanding a VxRail cluster? (Choose two.)
- A. 1 GbE must be hybrid and single processor node type
- B. G Series clusters can be expanded only with G Series nodes
- C. Expanding a cluster to 64 nodes requires a 25 GbE network
- D. Mixing of All-Flash and all-NVMe nodes in a cluster is not allowed
Answer: B,C
NEW QUESTION 60
A VxRail D560 cluster was delivered six months ago and now needs to be prepared for installation with the target code. What is the correct method to complete the task?
- A. Boot into RASR ISO and perform a RASR Reset
- B. Boot into RASR USB and perform a RASR Reset
- C. Boot into SD card and perform a Factory Reset
- D. Boot into RASR ISO and perform a Factory Reset
Answer: A
NEW QUESTION 61
An implementation engineer is performing a precheck on a VxRail cluster before expansion. During validation, they find out that the host is not compatible.
Use the VxRail simulator to describe why the host is Incompatible.
Note: It is necessary to close (x) the simulator window before you can select a response to this question.





- A. Insufficient number of vSphere licenses
- B. Invalid vCenter 5erver license
- C. Firmware of ESXi host needs to be updated
- D. bmc and bios are running older versions
Answer: B
NEW QUESTION 62
Match each component of the VxRail HCI System Software to its description.
Answer:
Explanation:
NEW QUESTION 63
A VxRail implementation engineer is validating the network environment with NVT. The proposed switch configuration is shown in the exhibit. The ToR Switch information file is available.
Use the VxRail simulator to set up NVT for switch validation. Import the switch Information and tag the ports based on the exhibit.
Answer:
Explanation:
Pending
Send your suggestions for this question.
NEW QUESTION 64
......
DCS-IE Fundamentals-DES-6322 Exam-Practice-Dumps: https://www.testkingpdf.com/DES-6322-testking-pdf-torrent.html
Use Real DES-6322 Dumps - EMC Correct Answers: https://drive.google.com/open?id=1-jbQNwaHqa8HhMD93tnBJwQBHfLFRaAn

