[Nov-2021] Verified SAP Exam Dumps with C-TS422-1909 Exam Study Guide [Q44-Q68]

Share

[Nov-2021] Verified SAP Exam Dumps with C-TS422-1909 Exam Study Guide

Best Quality SAP C-TS422-1909 Exam Questions TestkingPDF Realistic Practice Exams [2021]


SAP C-TS422-1909 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.


C-TS422-1909 Exam Certification Details:

Sample Questions: SAP C-TS422-1909 Exam Sample Question
Level:Associate
Languages:German, English, French, Chinese
Cut Score:55%
Exam:80 questions
Duration:180 mins

 

NEW QUESTION 44
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Insert operation
  • B. Find Slot
  • C. Scheduling working time only
  • D. Squeezing

Answer: B

 

NEW QUESTION 45
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When you deliver a sales order
  • B. When you create a sales order
  • C. When the MRP results are saved
  • D. When you create a planned order

Answer: B

 

NEW QUESTION 46
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:

  • A. Material Master -> Plant Settings -> MRP Group
  • B. MRP Group -> Material Master -> Plant Settings
  • C. Plant Settings -> MRP Group -> Material Master
  • D. Material Master -> MRP Group -> Plant Settings

Answer: D

 

NEW QUESTION 47
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Setup matrix
  • C. Operation network
  • D. Resource network

Answer: A

 

NEW QUESTION 48
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:

  • A. It enables the propagation of network alerts across the bill of materials structure
  • B. It replaces fixed pegging relationships unless they have been created for stock
  • C. It links receipts from an alternative location in case of a shortage in the default location
  • D. It propagates changed sales order priorities to the pegged planned orders

Answer: C

 

NEW QUESTION 49
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:

  • A. The presence of firmed planned orders
    Visit us athttp://examcertify.com/C_TS422_1909.html
  • B. The presence of production orders
  • C. The priority of the proposed solution
  • D. The viability of the proposed solution

Answer: D

 

NEW QUESTION 50
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:

  • A. By eliminating inventory tables
  • B. By eliminating fields for different stock types
  • C. By eliminating material master tables
  • D. By eliminating hybrid tables
  • E. By eliminating inventory history tables

Answer: A,B,E

 

NEW QUESTION 51
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing must be a rate routing.
  • B. The assigned routing must NOT have alternative sequences.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The lot size range must be within the lot-size range of the assigned routing.
  • E. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.

Answer: C,D,E

 

NEW QUESTION 52
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the production order type
  • C. In the production version
  • D. In the routing
  • E. In the bill of materials (BOM)

Answer: A,B,D

 

NEW QUESTION 53
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Material Requirements Planning (MRP)
  • B. Capacity Requirements Planning (CRP)
  • C. Demand Planning (DP)
  • D. Supply Network Planning (SNP)

Answer: A

 

NEW QUESTION 54
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Warehouse order
  • B. Outbound delivery order
  • C. Outbound delivery request
  • D. Warehouse task

Answer: C

 

NEW QUESTION 55
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:

  • A. They can be created automatically during month end process.
  • B. They can be used for repetitive manufacturing.
  • C. They can be used for manufacturing with collective orders.
  • D. They can be applied to make-to-stock production order.

Answer: B,D

 

NEW QUESTION 56
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Individual/Collective Indicator
  • B. Mixed MRP indicator
  • C. Dependent Requirements indicator
  • D. Storage Location MRP Indicator

Answer: B

 

NEW QUESTION 57
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:

  • A. Reduction of the capacity requirements
  • B. Archiving of backflush documents
  • C. Posting of production costs to cost collector
  • D. Staging of components for the next order in the sequence

Answer: B,C

 

NEW QUESTION 58
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.

  • A. Recipe approval (with Engineering Change Management)
  • B. Use of the GMP compliant flag in relevant master data applications
  • C. Documentation of quality data with Quality Management
  • D. Predefined GMP compliant process order types to meet audit requirements
  • E. Use of the digital signature function to check and run business processes

Answer: A,C,E

 

NEW QUESTION 59
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:

  • A. Setup time
  • B. Float before and float after production
  • C. Opening period
  • D. Goods receipt processing time

Answer: A,B

 

NEW QUESTION 60
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. For production lines with short lead times
  • B. You require an up-to-date inventory for components
  • C. When you need to determine the work in progress
  • D. When goods issues can wait for final confirmation

Answer: C,D

 

NEW QUESTION 61
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:

  • A. In the material master
  • B. In the plant parameters
  • C. In the MRP group
  • D. In the requirements class

Answer: A,C

 

NEW QUESTION 62
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Bulk materials
  • B. By-products
  • C. Waste products
  • D. Continuous flow materials
  • E. Co-products

Answer: B,C,E

 

NEW QUESTION 63
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Consumption sequence procedure
  • C. Order type
  • D. Requirements type

Answer: D

 

NEW QUESTION 64
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Assign planned orders manual lying the planning table.
  • B. Run PP/DS heuristics for repetitive manufacturing.
  • C. Run MRP with quota arrangement.
  • D. Run MRP with automatic selection of production version.

Answer: B,C

 

NEW QUESTION 65
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To increase the number of planning levels
  • B. To make the assignment of components easier
  • C. To reduce the number of material masters
  • D. To simplify the structure of bills of material
  • E. To reduce the number of changes required in bills of material

Answer: B,D,E

 

NEW QUESTION 66
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
Response:

  • A. System conversion
  • B. Landscape transformation
  • C. System upgrade
  • D. System activation
  • E. New implementation

Answer: A,B,E

 

NEW QUESTION 67
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with prioritized alternative work centers
  • B. A production line with more than one work center
  • C. A production line with a parallel sequence in the routing
  • D. A production line with an alternative sequence in the routing

Answer: B

 

NEW QUESTION 68
......


SAP C-TS422-1909 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.


 

Authentic Best resources for C-TS422-1909: https://www.testkingpdf.com/C-TS422-1909-testking-pdf-torrent.html