SAP PP Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Production Orders Basics (PP-SFC) | Apply production order functionality. SCM310 OR TSCM40, TSCM42 | 8% - 12% |
| Basics on SAP Business Processes (E-Learnings) | Outline the scope of SAP SCM business processes. TERP01, TERP50 OR TSCM40, TSCM42 | < 8% |
| Lean Manufacturing (PP-REM, PP-KAB) | Outline the highlights of repetitive manufacturing and kanban. SCM300, SCM130 OR TSCM40, TSCM42 | 8% - 12% |
| Application Overview and Background | haracterize the interplay of master data, planning, ATP, and production functionality. TERP50, SCM240, SCM300, SCM130ORTSCM40, TSCM42 | < 8% |
| Material and Capacity Requirements Planning | Characterize production-relevant planning functionality. SCM240, SCM365 OR TSCM40, TSCM42 | > 12% |
| Material Requirements Planning (PP-MRP) | Explore material requirements planning functions. SCM240 OR TSCM40, TSCM42 | > 12% |
| Master Data (LDM) | Set up master data for production planning and manufacturing. PLM114 OR TSCM40, TSCM42 | 8% - 12% |
| Production Orders Advanced (PP-SFC) | Configure production order functionality. SCM310 OR TSCM40, TSCM42 | > 12% |
| Process Orders (PP-PI) | Identify specific properties of process orders. SCM300, SCM130 OR TSCM40, TSCM42 | < 8% |
SAP PP Certification Exam Details:
| Duration | 180 mins |
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Number of Questions | 80 |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Level | Associate |
| Exam Code | C_TSCM42_67 |
| Sample Questions | SAP PP Certification Sample Questions |
| Exam Price | $550 (USD) |
| Schedule Exam | SAP Training |
| Passing Score | C_TSCM42_67 - 63% |
NEW QUESTION 37
What functions can you use for sub operations? (Choose two)
- A. Costing
- B. Production/Resource tools allocation
- C. Capacity planning
- D. Material component allocation
Answer: A,C
NEW QUESTION 38
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?
- A. Set "Container full"
- B. Set "Container empty"
- C. Set "Container in process"
- D. Set "Container in transport"
Answer: A
NEW QUESTION 39
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
- A. LTP focuses on the operational planning of important components.
- B. LTP creates purchase requisitions for external procurement.
- C. A planning scenario must be released before it can be used in LTP.
- D. Reorder point planned materials can be included in LTP.
Answer: C,D
NEW QUESTION 40
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order.
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)
- A. The MRP list displays the production order.
- B. The MRP list has the status "processed".
- C. The stock/requirements list displays the production order.
- D. The stock/requirements list was updated the moment it was accessed.
Answer: C,D
NEW QUESTION 41
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Lead time scheduling cannot take place.
- B. Requirements planning creates an appropriate exception message in basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
Answer: D
NEW QUESTION 42
Which activity can trigger an automatic availability check for the components of a production order?
- A. Material staging
- B. Goods receipt for a missing part
- C. Order release
- D. Order rescheduling
Answer: C
NEW QUESTION 43
Which of the following statements about the SAP Solution Manager listed is correct?
- A. Solution Manager is a stand-alone system that communicates with other systems in a system landscape.
- B. Solution Manager is an add-on industry solution.
- C. Solution Manager is part of the SAP ECC System.
- D. Solution Manager is a satellite system in a system landscape.
Answer: A
NEW QUESTION 44
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
- A. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- B. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
- C. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- D. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
Answer: A,B
NEW QUESTION 45
For which of the following objects can you enter a confirmation? (Choose two)
- A. Trigger Point
- B. Work Center
- C. Production order operation
- D. Production order
Answer: C,D
NEW QUESTION 46
Which of the following properties applies to multi-site planning in SAP ECC?
- A. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
- B. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- C. The use of "scope of planning" is always mandatory for multi-site planning.
- D. Multi-site planning can be activated using the corresponding planning strategy.
Answer: A
NEW QUESTION 47
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Activate the availability check and assign an overall profile in the production scheduling profile.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
- D. Assign an appropriate availability checking rule to the material master for the product.
Answer: C
NEW QUESTION 48
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
- A. The planning of MPS and non-MPS items is always carried out in one planning run.
- B. MPS items can be defined on plant level.
- C. MPS items can be defined on MRP area level.
- D. Non-MPS items can be taken into consideration by an MPS run.
- E. MPS items are planned in a standard MRP run.
Answer: B,C,D
NEW QUESTION 49
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- B. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
- C. A planning algorithm from capacity planning
- D. Manual assignment of planned production quantities in a planning table
- E. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
Answer: A,B,D
NEW QUESTION 50
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
- A. Define the user statuses in the Customizing table of the system statuses.
- B. Define a status profile in Customizing and assign it to the production scheduling profile.
- C. Define the user statuses in the order type-dependent parameters.
- D. Define a status profile in Customizing and assign it to the order type.
Answer: D
NEW QUESTION 51
In which master data object do you set the standard values for an operation?
- A. Material Master
- B. Production Resource/Tool (PRT)
- C. Routing
- D. Work Center
Answer: C
NEW QUESTION 52
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
- A. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
- B. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
- D. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
Answer: C
NEW QUESTION 53
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
- A. Substitute sequence
- B. Parallel sequence
- C. Alternative sequence
- D. Standard sequence
Answer: C
NEW QUESTION 54
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- A. Logistics Information System (LIS)
- B. Pick list
- C. Material directory
- D. Pull list
- E. Automatic generation of a transport order
Answer: B,D,E
NEW QUESTION 55
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. A storage location may be assigned to different MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. Subcontracting is supported by MRP areas.
- D. An MRP area may include different storage locations.
Answer: C,D