[2021] H35-912-ENU.pdf - Questions Answers PDF Sample Questions Reliable [Q75-Q91]

Share

[2021] H35-912-ENU.pdf - Questions Answers PDF Sample Questions Reliable

Huawei H35-912-ENU Dumps PDF Are going to be The Best Score

NEW QUESTION 75
What are included in the electrical safety requirements? (Multiple Choice)

  • A. Do not place the power cord on the ground.
  • B. Damaged power supply components must be replaced in time.
  • C. Do not overload the power supply.

Answer: A,B,C

 

NEW QUESTION 76
How many power modules does the E9000 support?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 77
What are the safety requirements for the operation on the tower? (Multiple Choice)

  • A. The tools to be carried should be packed in the bag to avoid falling.
  • B. The seat belt must be inspected before climbing the tower, and the climbing tower must wear a seat belt.
  • C. Make sure the seat belt is 2 different points
  • D. It is not allowed to climb a tower alone and must be accompanied by a caregiver.

Answer: A,B,C,D

 

NEW QUESTION 78
The basic principle of determining the level of violation: the nature of the act, the damage caused and the severity of the impact, or whether the offender intends to make a determination.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 79
Which is correct about the operation of live equipment and circuits?

  • A. Everyone can operate live equipment and circuits as long as they are insulated.
  • B. Operation of live equipment and circuits can only be carried out by personnel with relevant qualifications
  • C. Powerful operation requires qualified personnel to perform, weak power does not need

Answer: B

 

NEW QUESTION 80
After the network cutover is successful and the customer confirms the normal business data, you can leave the room immediately.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 81
Server survey includes two scenarios, one for determining the configuration of the BoQ for the pre-sales phase and for the supply chain, and the other for the detailed installation for hardware installation.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 82
Regarding the OLT chassis, which statement is incorrect?

  • A. The main control board of the MA5800-X17 is in slots 9 and 10.
  • B. MA5680T subrack supports 16 service slots.
  • C. MA5683T subrack supports 8 service slots.
  • D. The slots 1-7 and 10-17 of the MA5800-X15 are service slots.

Answer: C

 

NEW QUESTION 83
The OceanStor V3 series of next-generation storage products support 240v high-voltage DC input.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 84
Which of the following should be applied to the rope when manually hoisting?

  • A. Allowing jerk, emergency stop, flashing, etc.
  • B. Allowing jerk, emergency stop, flashing, etc. in the case of power assurance
  • C. Do not allow jerk, emergency stop, flashing, etc.

Answer: C

 

NEW QUESTION 85
How many fan modules does the E9000 support?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 86
What is the range of copper wire recommended by Vectoring/SuperVector/G.fast in the FTTC scenario?

  • A. 1Km~3Km
  • B. 500m~1Km
  • C. 5Km or more
  • D. 100m~500m

Answer: D

 

NEW QUESTION 87
When the MA5800 uplink fiber connection is connected, which statements are correct? (Multiple Choice)

  • A. Upstream adopts SC type fiber
  • B. One end is connected to the uplink port, and the other end is connected to the corresponding optical port of the ODF frame.
  • C. Fiber needs to be tied
  • D. The fiber needs to be placed in the bellows at the top of the cabinet.

Answer: B,C,D

 

NEW QUESTION 88
ONT is the "optical network terminal", commonly known as the light cat, which is usually placed in the living room or study room to provide Internet, video, voice and other services for home users.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 89
Which of the following is the general cabinet power-on procedure?

  • A. Cabinet input power distribution switch closed -> chassis module power switch closed -> single board switch closed
  • B. Chassis module power switch closed -> cabinet input power distribution switch closed -> single board switch closed.
  • C. Cabinet input power distribution switch closed -> single board switch closed -> chassis module power switch closed
  • D. Single board switch closed -> chassis module power switch closed -> cabinet input power distribution switch closed

Answer: A

 

NEW QUESTION 90
What are the precautions in the field? (Multiple Choice)

  • A. In order to prevent being robbed and harmed by dangerous animals, generally more than two people
  • B. Can't work too late
  • C. If dining inconvenience, you should have enough food.
  • D. Wear non-slip flat shoes and tight clothing which are suitable for field work

Answer: A,B,C,D

 

NEW QUESTION 91
......

Use H35-912-ENU Exam Dumps (2021 PDF Dumps) To Have Reliable H35-912-ENU Test Engine: https://www.testkingpdf.com/H35-912-ENU-testking-pdf-torrent.html